St. George Outfall Project (1998) - Project management for the
City of St. George related to installation of a 1,216 foot outfall line.
Work included permitting, design, quality control, and subcontractor installation
of 12-inch HDPE line onshore to connect three docks at the St. George
Harbor to the offshore portion of the line. Contract amount: $700,000.
Cottage E Renovation (1995) - Excavation to waterproof basement.
Work included excavation and backfill together with installation of polyguard
membrane, drain curtain and drain tile.
Zapadni camp Roof Renovation (1995) - Installation of 4,200 square
foot roof membrane to fix roof leak problems at camp.
St.George Fuel Facility (1993) - Project management
of construction of 1,050,000 gallon bulk fuel facility through subsidiary,
St. George Chadux Corporation, including construction of extensive pipeline
and pumping system. Facility constructed to meet all federal and State
of Alaska DEC regulations.
Zapadni Camp (1990) - Purchase, mobilization, site
work, and construction of 40-man construction camp. Work included assembly
of pre-fabricated modules together with construction of on-site septic
system. Renovation work has included installation of a new roof membrane,
plumbing and mechanical work, sheetrock and siding work, and installation
of new thermal pane windows.
Cottage G Renovation (1985) - Complete interior renovation
of residential property include framing, electrical, plumbing and heating,
sheetrock, and painting work.
St. George Store (1985) - Complete interior and construction
of commercial store, St. George Island, Alaska. Work included construction
of office space and post office.
St. George Fish Processing Facility (1983) - renovation
of metal warehouse into fish processing plant with bulk refrigeration
facility together with outfall construction and completion of addition
to warehouse for processing area and offices. Work included utility upgrade
and ordering and installation of all trade fixtures.
|